This promises to be a busy group with some interesting projects on the agenda. Here are some that are waiting for spring time and drier weather to get started:
1. Work on irrigation in the garden and around Building N.
2. Install drainage at the garden to include the center circle.
3. Modify the pump station doors, install drainage and complete path
4. Install terraces at rear of biofalls and repair steps up the bank.
5. Pressure clean, spray and waterproof the deck and walkways.
6. Plan and install drip irrigation for containers in front and rear of building.
7. Install a pathway to Building F.
8. Plan and install drainage at the greenhouse area.
If you would like to join this team let Hilton know (575-4943; hholcomb@atmc.net).